Documented projectIndustrial RO installation for evaporator use
The supplied project artwork documents a 1500 GPD / 250 LPH industrial RO installation in Dinajpur for evaporator use. The treatment train is identified as industrial RO with iron removal and multi-stage filtration, showing the importance of preparing groundwater before the membrane stage.
- Iron-control pretreatment before RO
- Multi-stage filtration for membrane protection
- Automatic control and flow monitoring
- Process-water production for evaporator use









